Grand River Water Supply Study - November 2023
Manage episode 386471229 series 3488594
Assistant City Manager of Operations Kenneth Schwab talks more about the Grand River Water Study that was authorized and approved by the Broken Arrow Municipal Authority.
This study investigated the 36-inch waterline that stretches more than 21 miles from the Oklahoma Ordnance Works Authority (OOWA) in Mayes County to the Verdigris River Water Treatment Plant.
47 episoade